Noise, Dust and Vibration Plans

Noise, Dust and Vibration Plans

Noise, Dust and Vibration Plans

Planning authorities are becoming more conscious of the effects a construction site can have on its neighbouring environment. Noise, Dust and Vibration monitoring are becoming more necessary. 

WPS can prepare the necessary document to submit for planning as well as provide advice and recommendation on the equipment and procedures for the monitoring processes.

Why Do You Need A Noise, Dust and Vibration Plan?

A noise, dust and vibration plan will help you to meet legally-binding planning obligations under the Section 106 agreement. By agreeing to these planning obligations you need to plan how you will offset negative impacts on the local environment caused by your development project.

Local procurement strategies are also part of complying with your section 106 agreement.

Call us for a quote today on 01604 859961 or contact us online using the form on the right.

WPS
Specialist Compliance Consultants.
How Can we Help You? See Our Brochure Get in touch
Our Case Studies
EME Installations Ltd Control Room, Reading
The Control Room project, in Reading, started in November 2010 and completed in May 2011. It was a fit out project to the control room of a concrete frame construction representing a floor area of…

Testimonials

Featured News

  • burning-charcoal
    Activated carbon is a highly versatile absorbent material that is widely used for abatement processes. In the waste industry it is often used in treatment of odours or entrapment of volatile organic compounds (VOCs).
  • future-of-transport
    We get involved with implementing NRMM (Non Road Mobile Machinery) compliance on construction sites in London and also preparing Noise, Dust and Vibration (NDV) Plans as well as Air Quality & Dust Management Plans (AQDMP).
  • single-use-plastic-bottles
    You’ve probably heard about single use plastics a great deal in the news recently. This is due to a push towards addressing the global plastic pollution crisis.
  • Bavarian-forest
    On the 11th January 2018, the Defra published its 25-Year Environment Plan outlining the objectives created to ensure that we leave the environment “in a better state than we found it”.
  • Towers-on-a-farm
    The rise in the number of Anaerobic digestion plants in recent years has been a massive success story. The industry has grown from nothing to 576 plants registered on the Anaerobic Digestion and Bioresources website.
  • cranes-on-building
    BREEAM is a method of measuring and assessing the sustainability of techniques used in the construction industry.

Contact

  • 4 Premier House
    43-45 Sanders Road
    Wellingborough
    Northamptonshire
    NN8 4NL
    United Kingdom
  • +44 (0)1604 859961
  • [email protected]

Newsletter

Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.

Registered Office: 1 Billing Road, Northampton, NN1 5AL

WPS Ltd is registered in England No. 7002484.

Copyright © 2018. WPS Ltd. All Rights Reserved | Privacy Policy | Terms & Conditions

Request Call Back

Get In Touch