Enhancing the Ecology (BREEAM LE04)

Enhancing the Ecology (BREEAM LE04)

https://pixabay.com/photos/deforested-construction-outskirts-574185/

The aim of this credit is to encourage actions to be taken to enhance the ecological value of the site as a result of the development. 

This requires a suitable qualified ecologist to confirm that the recommendations of the Ecology Report for the enhancement of site ecology have been implemented in the final design and build, and that this will result in an increase in ecological value of the site.

WPSCC can assist you in obtaining this credit.

 

Call us today on 01604 859961 for help and advice or use the Get in Touch button.

WPS
Specialist Compliance Consultants.
How Can We Help You? See Our Brochure Get in touch
Our Case Studies
HG Construction uses SitePlan.online
HG Construction use SitePlan.online to produce their Site Waste Management Plans (SWMPs) and Site Resource Management Plans (SRMPs).

Testimonials

Featured News

Contact

  • The Granary
    Barnfield Farm
    Finedon Road
    Finedon
    Wellingborough
    Northamptonshire
    NN9 5NQ
    United Kingdom
  • +44 (0)1604 859961
  • [email protected]

Newsletter

Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.

Registered Office: 1 Billing Road, Northampton, NN1 5AL

WPS Ltd is registered in England No. 7002484.

Copyright © 2018. WPS Ltd. All Rights Reserved | Privacy Policy | Terms & Conditions

Request Call Back

Get In Touch