Myddleton Lodge

Myddleton Lodge, WPS Compliance

Project Information

The Myddelton Lodge project commenced in December 2015 and was completed in August 2018. The project involved the demolition of some of the outbuildings in the grounds of Myddelton Lodge, refurbishment of the Lodge itself and the construction of a luxury 7* private Lodge. Due to the high profile of the site and the client, high expectations were imposed by the local planning authority and it is for this reason that WPS was retained by Base Contracts to provide the necessary consultancy services to support achievement of the BREEAM excellent target, the Considerate Constructors Scheme (CCS) target of 40+ points and also satisfy Corporate Social Responsibility (CSR) expectations, in addition to satisfying the stringent s106 requirements imposed by the local council.

Functions Undertaken

WPS started with the Pre-refurbishment Audit of the Lodge and outbuildings, feeding the results into the Site Waste Management Plan (SWMP), (using WPS’s own software tool, WastePlan, later upgraded to SitePlan), thereby contributing to BREEAM Wst01, planning, CCS and CSR. WPS then prepared the Materials Management Plan (MMP) for the construction phase of the project to achieve BREEAM credits (Mat03). For the duration of the project WPS managed the Water, Energy and Carbon Plans, monitoring site impacts, to achieve BREEAM credits (Man03), CCS points and CSR. Relating to procurement, WPS developed the Sustainable Procurement Policy and the Responsible Sourcing of Timber Policy, for BREEAM (Mat03), CCS and CSR. WPS continued the Materials Efficiency Plan which was started by the Architects and earned BREEAM (Mat06) credits, as well as contributing to CCS and CSR. Logistics, Traffic, Transport and Green Travel Plans contribute to BREEAM (Tra05 & Man03), CCS and CSR. Final project handover documentation included the provision of Building User Guides, O & M Manuals and Building Training Plans, to satisfy other BREEAM and client requirements. In addition to the above contributions assisting with CCS points, WPS provided additional consultancy to contribute towards points for the following sections: Appearance, Community, Environment, Workforce, Innovation and Site Specific.

For s106 consultancy please see the separate Case Study.

Conclusion

WPS ensured that the necessary BREEAM credits were achieved for the required excellent standard. All planning conditions have been satisfied, including the s106 requirements (see separate CS). The highest CCS score achieved was 43 points and earned a Bronze award.

In addition, on behalf of Base Contracts, WPS entered the project into the London Construction Awards (Sustainability project of the year) and it was shortlisted as a finalist.

 

Click here to download to PDF

WPS
Specialist Compliance Consultants.
How Can We Help You? See Our Brochure Get in touch

Testimonials

Featured News

  • Women in construction, changing equality.
    The Inspire Summit 2018: Women in UK Construction, Engineering & Housing saw an array of speakers and attendees offer their perspective on many different topics that pivoted off the subject 'women in construction.' Gina Tara has detailed her account of...
  • china, recycling, landfill
    Although Europe prides itself on being one of the leaders in sustainability, much of this success has relied on the exportation of waste elsewhere, particularly to China. For example...
  • burning-charcoal
    Activated carbon is a highly versatile absorbent material that is widely used for abatement processes. In the waste industry it is often used in treatment of odours or entrapment of volatile organic compounds (VOCs).
  • future-of-transport
    We get involved with implementing NRMM (Non Road Mobile Machinery) compliance on construction sites in London and also preparing Noise, Dust and Vibration (NDV) Plans as well as Air Quality & Dust Management Plans (AQDMP).
  • single-use-plastic-bottles
    You’ve probably heard about single use plastics a great deal in the news recently. This is due to a push towards addressing the global plastic pollution crisis.
  • Bavarian-forest
    On the 11th January 2018, the Defra published its 25-Year Environment Plan outlining the objectives created to ensure that we leave the environment “in a better state than we found it”.

Contact

  • The Granary
    Barnfield Farm
    Finedon Road
    Finedon
    Wellingborough
    Northamptonshire
    NN9 5NQ
    United Kingdom
  • +44 (0)1604 859961
  • [email protected]

Newsletter

Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.

Registered Office: 1 Billing Road, Northampton, NN1 5AL

WPS Ltd is registered in England No. 7002484.

Copyright © 2018. WPS Ltd. All Rights Reserved | Privacy Policy | Terms & Conditions

Request Call Back

Get In Touch