Project Information

The Control Room project, in Reading, started in November 2010 and completed in May 2011. It was a fit out project to the control room of a concrete frame construction representing a floor area of approximately 1250m2. The project had plenty of scope for waste minimisation techniques to be identified at the pre construction phase of the site waste management plan (SWMP)EME Installations Ltd enlisted the assistance of WPS Ltd, to help them integrate the SWMP into all of their projects.

The Approach taken

Numerous waste minimisation decisions were undertaken successfully during the fit out phase of the SWMP including;

• The reuse of materials where possible by utilising NISP and Recipro, to reduce surplus waste arisings
• Segregation of timber and metal waste on site to reduce waste sent to landfill and minimise the cost of disposal 
• The return of cable drums to suppliers to reduce waste arisings on site 
• Effective dismantling techniques of computers to reduce WEEE waste
• Segregation of removed carpet tiles to allow for full recycling.

Achievements

The targets set in the SWMP were to reduce site waste by 10%, to recycle 80% and to send only 10% to landfill, this target was easily achieved through site practices and the assistance of their waste contractors. The original forecast for waste arisings was 90 tonnes, but less than 21 times that amount was actually produced, which for a project cost of £2,000,000 and the floor area is impressive. An area of particular achievement was in relation to the handling of the waste carpet tiles. From the outset of the project they were set to go to landfill, however through the work of WPS Ltd, a local solution was found that meant 100% of the carpet tiles were recycled with a local manufacturer.

Cost savings

The project was estimated to use 20 skips, but only 5 were needed. As a result of the reduced number of skips required and the segregation that took place; which reduced the cost of waste removal in comparison to the removal of a mixed waste skip going to landfill. The project saved over £3,000; this cost saving equates to 90% of the project’s waste budget.

Lessons Learnt

Segregated waste skips will always be considered for future projects as they reduce the waste disposal costs and only waste contractors will be used with high offsite recycling rates to ensure best practice and reduction of waste to landfill.

Due to the nature of EME Installations’ contracts the segregation and recycling of carpet tiles from refurbishment projects will always be considered where relevant, as it is simple to implement on site and offers benefits for doing so.

EME Installations Ltd plan to develop their own in house forecasting data, assisted by WPS to ensure that the pre construction plan aligns as closely as possible to actual waste
arisings data.

In conclusion

EME Installations Ltd are delighted with the integration of SWMPs onto their sites and will continue to strive to achieve their target of 5% project savings through SWMPs. There are further areas of potential savings they would like to continue to address through the assistance of WPS Ltd.

EME Installations Ltd

EME Installations Ltd is a premier supplier of bespoke electrical and mechanical installations throughout the UK. From initial design and fabrication through to commissioning and maintenance of completed projects, EME’s highly trained and experienced staff ensure delivery of superior service.

County: Leicster

Tel: 0116 260 6107

Fax: 0116 260 7490

WPS
Specialist Compliance Consultants.
How Can We Help You? See Our Brochure Get in touch

Testimonials

Featured News

  • burning-charcoal
    Activated carbon is a highly versatile absorbent material that is widely used for abatement processes. In the waste industry it is often used in treatment of odours or entrapment of volatile organic compounds (VOCs).
  • future-of-transport
    We get involved with implementing NRMM (Non Road Mobile Machinery) compliance on construction sites in London and also preparing Noise, Dust and Vibration (NDV) Plans as well as Air Quality & Dust Management Plans (AQDMP).
  • single-use-plastic-bottles
    You’ve probably heard about single use plastics a great deal in the news recently. This is due to a push towards addressing the global plastic pollution crisis.

Contact

  • The Granary
    Barnfield Farm
    Finedon Road
    Finedon
    Wellingborough
    Northamptonshire
    NN9 5NQ
    United Kingdom
  • +44 (0)1604 859961
  • [email protected]

Newsletter

Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.

Registered Office: 1 Billing Road, Northampton, NN1 5AL

WPS Ltd is registered in England No. 7002484.

Copyright © 2018. WPS Ltd. All Rights Reserved | Privacy Policy | Terms & Conditions

Request Call Back

Get In Touch