The Chancery Lane project commenced in August 2015 and is scheduled to complete October 2018. The project involves the demolition of the existing building at Chancery Lane and redevelopment behind the retained façade of The Public House to provide a basement plus 8 storey building comprising a mix of offices at part basement and part ground floor levels, Apart’ Hotel at part basement and part ground floor and first to seventh floor levels. The need to satisfy stringent planning constraints led to our client retaining WPS as consultants to assist with achieving the required BREEAM accreditation, Considerate Constructors Scheme (CCS) attainment, the planning 106 Agreement conditions and achieving Corporate Social Responsibility (CSR) aspects.

Functions undertaken

WPS started with the Pre-demolition Audit, feeding the results into the Site Waste Management Plan , (SWMP) (using WPS’s own software tool, WastePlan upgraded to SitePlan), thereby contributing to BREEAM Wst01, planning, CCS and CSR. WPS then prepared the Construction Environmental Management Plan (CEMP) and the Noise, Dust and Vibration Plan (NDV) to satisfy planning conditions. For the duration of the project WPS will be managing the Water, Energy and Carbon Plans, monitoring site impacts, to achieve BREEAM credits (Man03), CCS points and CSR. Relating to procurement, WPS developed the Sustainable Procurement Policy and is managing the Local Labour and Procurement Plans for ‘the City’ as well as the Sustainable Procurement Plan for BREEAM credits, CCS points and CSR. Ongoing FORS and CLOCS compliance monitoring is supervised by WPS to satisfy ‘the City’, contribute to CCS points and help with CSR and the Operational Waste Audit carried out by WPS achieved the BREEAM Wst03 credit. Logistics, Traffic, Transport and Green Travel Plans contribute to BREEAM (Tra05 & Man03), CCS and CSR. The Environmental Management System (EMS) prepared to BS standard BS8555:2003, phase 4 contributes to BREEAM (Man03), CCS and CSR. In addition to the above contributions assisting with CCS points, WPS provides further Considerate Constructors Scheme consultancy to contribute towards points for the following sections:

Appearance, Community,

Environment, Workforce,

Innovation and Site Specific.

 

Conclusion

WPS ensured that the necessary BREEAM credits were achieved for the required excellent standard. All planning conditions and s106 conditions are in the final stages of being satisfied, as are the local requirements of ‘the City’. The final CCS inspection achieved 39 points.
 

Click here to download to PDF

WPS
Specialist Compliance Consultants.
How Can we Help You? See Our Brochure Get in touch

Testimonials

Featured News

  • Women in construction, changing equality.
    The Inspire Summit 2018: Women in UK Construction, Engineering & Housing saw an array of speakers and attendees offer their perspective on many different topics that pivoted off the subject 'women in construction.' Gina Tara has detailed her account of...
  • china, recycling, landfill
    Although Europe prides itself on being one of the leaders in sustainability, much of this success has relied on the exportation of waste elsewhere, particularly to China. For example...
  • burning-charcoal
    Activated carbon is a highly versatile absorbent material that is widely used for abatement processes. In the waste industry it is often used in treatment of odours or entrapment of volatile organic compounds (VOCs).
  • future-of-transport
    We get involved with implementing NRMM (Non Road Mobile Machinery) compliance on construction sites in London and also preparing Noise, Dust and Vibration (NDV) Plans as well as Air Quality & Dust Management Plans (AQDMP).
  • single-use-plastic-bottles
    You’ve probably heard about single use plastics a great deal in the news recently. This is due to a push towards addressing the global plastic pollution crisis.
  • Bavarian-forest
    On the 11th January 2018, the Defra published its 25-Year Environment Plan outlining the objectives created to ensure that we leave the environment “in a better state than we found it”.

Contact

  • The Granary
    Barnfield Farm
    Finedon Road
    Finedon
    Wellingborough
    Northamptonshire
    NN9 5NQ
    United Kingdom
  • +44 (0)1604 859961
  • [email protected]

Newsletter

Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.

Registered Office: 1 Billing Road, Northampton, NN1 5AL

WPS Ltd is registered in England No. 7002484.

Copyright © 2018. WPS Ltd. All Rights Reserved | Privacy Policy | Terms & Conditions

Request Call Back

Get In Touch