Exciting News – FREE Virtual CPD Sessions!
Exciting News – FREE Virtual CPD Sessions! For two Fridays in April, 19th & 26th, WPS is offering FREE CPD sessions as follows: 19th April:
Here at WPS Compliance Consulting we love to make a difference to our clients who need to achieve a level of BREEAM accreditation for their project. We believe that by approaching BREEAM using our unique, ‘out of box’ thinking we provide our clients with an holistic and cost effective solution.
Pre-demolition audits are a requirement for meeting BREEAM Wst 01 Construction Waste Management Standard. Find out more about this BREEAM standard. To comply with BREEAM Wst 01 you may also need a Pre-refurbishment audit and a Site Waste Management Plan. Some of our clients include Dust Architects, Chronicle Partners and the McLaren Group.
This BREEAM credit ensures that a building’s sound insulation meets the approved standard for its purpose.
Whether you are working towards BREEAM 2014 or BREEAM 2018, we can help you achieve the credits you require.
WPSCC guarantee to immediately increase your score for the Considerate Constructors Scheme.
A BUG is an essential part of the handover documentation for the BREEAM Man04.4 credit.
This BREEAM credit was originally satisfied by producing a Site Waste Management Plan (SWMP) for a project. However, it is now 1 element of a site Resource Management Plan (RMP).
1 element of a site Resource Management Plan (RMP), combining waste management with the measuring / monitoring of site impacts.
This credit is designed to encourage development on land that already has limited value to wildlife and to protect any existing ecological features.
The aim of this credit is to encourage actions to be taken to enhance the ecological value of the site as a result of the development.
The LE05 (BREEAM 2014) credit previously placed focus on the contractor, requiring them to carry out a number of actions.
This BREEAM Credit aims to recognise and encourage measures to optimise material efficiency in order to minimise the environmental impact of materials use and also waste predicted from the proposed construction project.
A Sustainable Procurement Policy is required for compliance with BREEAM Mat 03 Responsible Sourcing of Materials standard.
The MAT03.2 credit refers to the responsible sourcing of products. All timber purchased needs to be FSC or PEFC certified. All certificates need to be checked and recorded from the relevant deliveries.
The aim of this credit is to minimise the impact of a building development on the existing site ecology.
Operation and Maintenance Manuals, together with Building User Guides, are an important part of the handover of a building to the client.
An operational waste audit can help you to plan and monitor what happens to the waste generated once the new or refurbished building is in operation.
Pre-demolition audits are recommended by The Institute of Civil Engineers (The ICE Demolition Protocol) and can be requested for planning requirements.
Pre-refurbishment audits involve the assessment and analysis of waste produced from the demolition element of a building refurbishment (requirement of BREEAM assessment).
The aim of this credit is to encourage the use of recycled and secondary aggregates during a project, thereby reducing the demand for virgin material and optimising material efficiency in construction.
The aim of this credit is to reduce the likelihood of noise arising from fixed installations on the new development affecting nearby noise-sensitive building types (receptors).
An Environmental Management System (EMS) is a set of practices that documents how a principal contractor reduces their overall environmental impact and reduces waste costs.
The aim of this credit is to recognise and encourage construction sites to be managed in an environmentally and socially considerate, responsible and accountable manner.
WPSCC resource efficiency services help reduce the impact your use of materials has on the environment.
Section 106 (s106) demands or requirements are a planning constraint. They are stated as a Planning Condition by the local planning authority when planning permission is granted.
We provide a comprehensive Site Waste Management service, which can either be included with other consultancy services, or billed on a fixed-price basis, according to your project needs.
As part of the BREEAM Man03 credits requires site transport data to be recorded and analysed.
At WPSCC we offer a range of solutions for managing your SWMPs.
SitePlan (www.siteplan.online) is an online software tool that produces comprehensive, compliant Site Waste Management Plans (SWMPs).
As part of building handover, Training Schedules have to be prepared detailing which building occupants will be trained in the operation of which installed elements when.
Exciting News – FREE Virtual CPD Sessions! For two Fridays in April, 19th & 26th, WPS is offering FREE CPD sessions as follows: 19th April:
Exciting News – FREE Virtual CPD Sessions! For two Fridays in April, 19th & 26th, WPS is offering FREE CPD sessions as follows: 19th April:
Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.
We use cookies on our site by continuing to browse our site, you agree to the use of these cookies. You can read our cookie policy and learn more here